Previous Topic

Next Topic

Book Contents

Book Index

Select Total Stations dialog

The Select Total Stations dialog appears, if you add a Terrestrial Engine RT, a Terrestrial Engine PP, or an Integrated Survey Engine module to the system or change its properties, then set the focus onto one of the Correct distance ppm or the Correct vertical angle value fields and click the browse button.

Use the dialog to select the total stations, whose measurements should be corrected using the measurements to the reference targets.

The correction is done by a comparison of the calculated and the measured value for either the distance (if you are setting the Correct distance ppm property) or the vertical angle (if you are setting the Correct vertical angle property) of the reference point. This difference is transferred to a correction applied to the measured value(s) of the monitored points.

To select a total station from the list, select the respective check box. The All button selects all total stations, the None button removes all selections. By default, no total station is selected.

Tip - When adding a Terrestrial Engine PP module to the tree or when there has been no JobXML file imported so far to it, this dialog will not show any total stations.

See Also

Data Collector: Input of real-time total station data

Terrestrial Engine RT Properties - General Settings

Terrestrial Engine PP Properties - General Settings

Integrated Survey Engine Properties - General Settings

Select Reference Targets dialog